Stall reported in Sandy Springs on I-285 WB after New Northside Dr/Exit 22 (WB). Reported by Police
incident
I-75-TOLLNB
Accident. Traffic being directed around accident area in Stockbridge on I-75 Exp Lanes NB before I-675/Exit 227. Reported by Police
incident
I-75NB
Accident. Left lane blocked in Stockbridge on I-75 NB at I-675/Exit 227. Reported by Cameras
incident
I-75/I-85NB
Accident. Right shoulder blocked in Downtown Connector on 75/85 NB at Fulton St-Central Ave/Exit 246 (NB). Reported by Cameras
incident
I-285WB
Accident reported in Dunwoody on I-285 WB after N Peachtree Rd/Exit 30 (WB). Reported by Police
construction
GA-141SB
Road work. One lane open in Peachtree Corners on Medlock Bridge Rd SB between Ridgegate Dr and E Jones Bridge Rd/Medlock Bridge Rd. Reported by Tip Line
incident
US-19SB
Stall reported in Sandy Springs on GA 400 SB at Abernathy Rd/Exit 5 (NB). Reported by Police
incident
East-West ConnEB
Accident. Left lane blocked in Smyrna on East West Connector EB past Fontaine Rd SE. Reported by Tip Line
construction
10th StBoth EB/WB
Closed for sewer valve replacement in Georgia Tech on 10th St EB/WB between Curran St and Hemphill Ave. Reported by ATLDOT
incident
East-West ConnWB
Accident. Left lane blocked in Smyrna on East West Connector WB before Fontaine Rd SE. Reported by Police
construction
Peachtree Center Avenue NortheastNB
Closed due to road construction in GA State Univ on Peachtree Center Avenue Northeast NB between Decatur St and Edgewood Ave. Reported by ATLDOT
construction
US-19NB
Long-term road construction in Alpharetta on GA-400 NB between Windward Pkwy/Exit 11 and McFarland Pkwy/Exit 12. Reported by GDOT
construction
US-19SB
Long-term road construction in Alpharetta on GA-400 SB between McFarland Pkwy/Exit 12 and Windward Pkwy/Exit 11. Reported by GDOT
construction
McGinnis Ferry RdNone
New McGinnis Ferry exit construction in Milton on McGinnis Ferry Rd between Bethany Rd and McFarland Rd
construction
I-85NB
Long-term road construction in Opelika AL on I 85 NB between Andrews Rd/Exit 66 and Cusseta (CR-388)/Exit 70
construction
GA-9Both NB/SB
Long-term road construction in Milton on Atlanta Hwy NB/SB between Windward Pkwy and Peachtree Pkwy. Reported by GDOT
construction
GA-205Both NB/SB
Bridge replacement work in Acworth on Bells Ferry Rd NB/SB between N Victoria Rd and Marina Court. Reported by GDOT
construction
GA-369Both EB/WB
Long-term road construction in Cumming on Browns Bridge Rd EB/WB between Bridgetowne Drive and Keith Bridge Rd. Reported by GDOT
construction
GA-20Both EB/WB
Long-term road construction in Ducktown GA on Canton Hwy EB/WB between Post Rd and I-575. Reported by GDOT
construction
Circle 75 PkwyBoth NB/SB
Long-term road construction in The Battery on Circle 75 Pkwy NB/SB between Cobb Pkwy and Windy Ridge Pkwy SE. Reported by GDOT